Blog

Strongco Announces Exclusive K-Tec Scraper Agreement

02/21/2014 17:00

 MISSISSAUGA, ON, Feb. 20, 2014 /CNW/ – Strongco Corporation (TSX:SQP) announced today it has created a partnership with K-Tec Earthmovers Inc. (“K-Tec”) to be the exclusive dealer for K-Tec’s earthmoving scrapers in Alberta and Ontario.

In a lengthy-term partnership, K-Tec are classified as the only scrapers approved, certified and held by Volvo construction equipments (“Volvo”) that can be attached with both used and new A35 and A40 Articulating Dump Trucks (“ADT”). A Volvo ADT pulling a K-Tec scraper may be known as an industry advancement, promoting greater versatility and cost efficiencies, plus the possiblity to get into and compete within the scraper marketplace while still using existing fleets.

“We’re very happy to have Strongco join the team of dealers who support our scraper line,” said Russ Goossen, CEO of K-Tec. “Alberta and Ontario are significant markets, this also new alignment has an expanded platform to deliver our products to the telltale regions, sustained by Strongco’s exceptional customer care and in-house product expertise.”

“Adding K-Tec is in keeping with Strongco’s means of organic growth through brand expansion plus a complement to your existing Volvo production,” stated Bob Dryburgh, President & CEO of Strongco. “We have now demonstrated the product or service with select customers with extremely positive responses. This new offering we can deliver a wider array of choices to current clients and fosters a way to reach a broader customer base.”

Forward-Looking Statements

This news release contains “forward-looking” statements in the concept of applicable securities legislation which entail known and unknown risks, uncertainties and also other factors which may result in the actual results, performance or achievements of Strongco or industry results, to become materially completely different from any future results, events, expectations, performance or achievements expressed or implied by such forward-looking statements. All such forward-looking statements are produced pursuant for the “safe harbour” provisions of applicable Canadian securities legislation. Forward-looking statements typically contain words or phrases for instance “may”, “outlook”, “objective”, “intend”, “estimate”, “anticipate”, “should”, “could”, “would”, “will”, “expect”, “believe”, “plan” along with similar terminology suggesting future outcomes or events. Good news release contains forward-looking statements pertaining to the expected trading of common shares of Strongco for the TSX, and such statements are considering the expectations of management.

About K-Tec Earthmovers Inc.

K-Tec is often a leader and innovator in pull-type scraper manufacturing in The united states. K-Tec scrapers home in size from 25 to 57 cubic yards, could be pulled by articulated dump trucks in several job environments, and have absolutely ground-breaking durability, backed by a three-year structural warranty. K-Tec currently has units working in an array of conditions, including open pit mining, coal fields, road building, site development, farm field leveling, ditching and civil engineering projects. K-Tec is a privately held company headquartered in Rosenort, Manitoba.

About Strongco Corporation

Strongco Corporation is a major multiline mobile equipment dealer with operations across Canada plus north america, operating through Chadwick-BaRoss, Inc. Strongco sells, rents and services equipment utilised in diverse sectors like construction, infrastructure, mining, gas and oil, utilities, municipalities, waste management and forestry. The Company has approximately 750 employees serving customers from 27 branches in Canada and five in the states. Strongco represents leading equipment manufacturers with globally recognized brands, including Volvo construction equipments, Case Construction, Manitowoc Crane, including National and Grove, Terex Cedarapids, Terex Finlay, Terex Equipment, Ponsse, Fassi, Allied Construction, Taylor, ESCO, Dressta, Sennebogen, Jekko, Takeuchi, Link-Belt and Kawasaki. Strongco is listed for the Toronto Currency markets within the symbol SQP.

Mechanic Killed in Accident at Volvo Construction Equipment

02/21/2014 16:54

 Officials the man was killed when a front-end wheel loader he had been working away at slipped over support stands and fell on him.

A worker who was simply killed if a bit of heavy equipment fell on him for a Volvo-owned company in San Leandro this morning was obviously a 48-year-old Castro Valley man, a situation workplace safety official said.

The incident was reported at 9:31 a.m. at Volvo construction equipments and Services at 1944 Marina Blvd., fire spokeswoman Aisha Knowles said.

California Department of Occupational Safety and Health spokesman Peter Melton said the man, a field service technician, was working with a front-end wheel loader that were lifted up onto support stands when the equipment slipped and fell onto him.

Fire crews arrived and located the victim crushed under the equipment. He was pronounced dead for the scene, Knowles said.

Firefighters assisted personnel from the Alameda County coroner’s bureau in taking out the body, Knowles said. Crews used an analog hoist to lift kit, she said.

In accordance with Cal/OSHA records, the business has not yet previously been cited for just about any safety violations, Melton said.

Few others injuries were reported in association with the accident.

The coroner’s bureau has never yet released the worker’s name.

KOBELCO Construction Machinery USA to Host Fundraiser at ConExpo Supporting Wounded Warrior Project

02/21/2014 16:46

 KOBELCO construction machinery USA announced today intends to donate $100,000 to the non-profit organization Wounded Warrior Project? (WWP) in the sale of 5 KOBELCO SK350 special crawler excavators meant to support our troops. One of these machines will be on display in Silver Lot Booth 4408 at ConExpo 2014 from March 4th �C March 8th in Sin city, Nevada. Supplementing the company��s donation will probably be monies collected from attendees making donations throughout the show in KOBELCO��s exhibit. The WWP supports the full selection of programs and services due to this generation of injured veterans and their loved ones.

Salute Our Troops Excavator 2Over 47,000 servicemen business women are actually injured within the recent military conflicts. In addition to the physical wounds, it’s estimated that as many as 400,000 service members swallow the visible wounds of war including combat-related stress, major depression, and post-traumatic stress disorder. Another 320,000 are considered to have experienced a traumatic brain injury throughout deployment.

WWP��s 18 programs and services are uniquely structured to nurture the mind and the entire body and encourage economic empowerment and engagement.

All KOBELCO employees working in the booth space will assist support the onsite efforts in the show to raise as many funds as you can for your WWP. The show attendance is anticipated to get over 120,000 people.

KOBELCO construction machinery USA is really a Houston based heavy equipment manufacturer specialized in putting together a full-range of crawler excavators inside 3,000 lb. to 184,000 lb. classes to the rental, landscape, construction, aggregate, roadbuilding, material handling, site preparation, recycling and ancillary markets, including zero tail swing, standard, long-reach little models. KOBELCO is well-known worldwide as excavator perfectionists for its steadfast consentrate on improving and enhancing its singular line of merchandise. KOBELCO machines are well-regarded for his or her advanced technologies, including a cutting-edge noise and dust reduction system, advanced hydraulic circuitry for reduction of pressure loss and superior fuel efficiency.

During the entire 5 day ConExpo event, attendees can you can visit KOBELCO��s booth to acquire their photo taken using this special machine, that is covered with graphics made to salute our troops and includes the logos of all five individuals armed force divisions. The machine��s bucket will serve as a donation drop point for attendees wanting to offer the WWP. Graphic displays nearby the machines will thank the 5 authorized KOBELCO dealers who’ve purchased the SK350��s as well as the end-user retail customers who’ll position them to be effective from the field.

��It’s been a tradition for KOBELCO to add a patriotic component in this ConExpo display every three years if this expansive show is located in Las Vegas. This year��s theme became a natural tie-to the WWP and now we are excited so that you can raise funds to aid making use of their efforts in honoring and supporting the requirements of our veterans. KOBELCO cares and is also thankful for that chance to give something here we are at those men and women who sacrificed their lives to produce ours safer,�� states Ron Hargrave, Second in command of Operations for KOBLECOconstruction machinery USA.

For more information on KOBELCO Construction Machinery USA please go to www.cn-crane.com

wide Manufacturing Leader of Industrial Heavy Construction Machinery

02/21/2014 16:36

 Caterpillar Inc, the economic off industrial ��. Turns to All Noise Control to provide all of them with industrial acoustic solutions. Heavy construction machinery is an understatement when speaking about Caterpillar Inc, a new-wide company producing world-class industrial machinery & equipment. With the corporate offices in Morton IL, Caterpillar Inc experienced some acoustic conditions can be extremely common in manufacturing of machinery and equipment. They wanted to isolate unhealthy noise levels from machines within their facility.

All Noise Control features a full line of business acoustic products associated with the acoustic blankets and curtains that production facilities will always be needing. We claim that you look for our Industrial Acoustic Blanket & Curtain Systems here or visit our Acoustic Blanket Portable Enclosures for applications requiring more portable flexible applications. We also have a unique creation that can be an acoustic blanket door panel that helps reduce noise traveling through doors which might be often a bit more prone to transmit noise because of the materials. Whether an industrial plant, a manufacturing or treatment facility, heavy construction or any industrial applicaiton, All Noise Control provides the industrial acoustic materials, hardware and adhesives to discover the job done and eliminate your noise problems.

Using All Noise Control��s popular industrial strength acoustic blanket, AB1, Caterpillar Inc. was able to quickly fabricate an industrial acoustic enclosure that prevented the equipment from distributing unhealthy noise. The successful implementation individuals products led to a quieter facility that also includes the positive effects of improved work conditions. These conditions produce a healthier workplace which always peaks productivity and general demeanor.

We invite that you call All Noise Control at 561-964-9360 to talk about the noise control materials supplied to the present particular secondary school and are just as content to listen to your individual needs and offer you having a customized All Noise Control Solution. It’s also possible to visit our acoustic blanket page for more information at https://www.cn-crane.com.

Able Rigging Dismantles 3 Cranes In 5 Days

02/20/2014 17:08

 Big apple��February 25, 2009�� ABLE Rigging successfully demobilized three cranes in 5 days to overpower the deadline for brand spanking new York��s annualtower crane moratorium. The ABLE team were required to jump down three cranes before November 23, 2009 to conserve the contractors on the lakh dollars over the moratorium. A few locations were all in Manhattan near subways and commercial towers. All three jobs required multiple street closures.

The demobilization on the three cranes began on Wednesday, November 18, on West 51st Street, a nighttime job that began at 10 p.m., followed by a second tower cranedemobilized at 123 Washington Street on Saturday, November 21, and also a third on 45th Street on Sunday, November 22.

The crane used in the Washington Street site was a Liebherr 540 HC-L 131 boom 100K counterweight erected to maximum height, including a 700�� external climber, with six external building tie-ins erected to 38 20�� sections (760��). A Liebherr LTM 1250, 159K counterweight, 204 boom, half outriggers and Link-Belt RTC 8040 second assist were used in the demobilization in the crane. The crane was erected in September 2008 for your erection of concrete superstructure exterior curtain wall. The project took 16.5 hours while crews worked in a very restricted space that only allowed the usage of half outriggers on both sides with the crane.

The initial crane dismantled would be a freestanding, 11-section Favco 220 90�� boom, used at maximum height on West 51st Street. The work site was near Rockefeller Center, where you can television network NBC plus the Radio City Vaudeville theater as well as several other commercial towers. ABLE crews needed to have night to reduce the disruption to those businesses. The crane was erected in September 2009 for the fabrication of any concrete superstructure lifting a Max 18K concrete bucket. The crew used a Liebherr LTM 1250, 77K counterweight along with a Terex RT 335 second help to get it done. The dismantling took 11 hours.

For the West 45th Street site, a freestanding Favco 220 105�� Boom erected 35 sections 455�� employing a Luffer, externally-tied external climbing unit with four building tie-ins. The crane took 12.5 hrs to adopt down 3 days to eliminate all tie ins and 22 sections having a Liebherr LTM 1250, 104K counterweight, 204 Boom as well as a Link-Belt RTC 8040, second assist. The tower crane was erected in August 2008 for your erection of an concrete superstructure exterior curtain wall and HVAC units.

ABLE Rigging works as a standalone rigging company and utilized exactly the same crew for all those three jumps. Master rigger Robert LaChapelle served as supervisor for many three job sites having a crew of Tower crane demobilization specialists led by rigging foreman Vincent J. Bill.
��That anybody do is run cranes, rig them and disassemble them,�� said LaChapelle. ��On that day in day trip experience would be the only thing which enables this work safe. Experience, professionalism , reliability , preparation were the tips for ABLE Rigging��s chance to execute these three unique and challenging jobs in that small amount of time frame.��

The greatest challenge with one of these jobs was the logistics. ABLE crews had to exercise than 40 trailer loads from the city without any staging area at some of the three project sites. With three sites in close proximity to subways, ABLE crews had to carefully monitor the soil loadings place down from the assist crane. In addition , they had to identify subsurface structures and plan supports and mats to minimize ground pressure. The minimum counterweight required in order and keep outrigger loads to a minimum.

Regarding the ABLE ORGANIZATION
Founded in 1986, The ABLE Organization is often a family-owned and certified women-owned company that includes ABLE Equipment Rental, ABLE Rigging Contractors, and ABLE Power Rental. The ABLE Organization��s dedicated team of specialists provides reliable products and attentive service for construction projects during the entire Nyc metropolitan area.

Able Equipment Rental. ABLE Equipment Rental, Inc. has an extensive choice of aerial and construction equipment, and also mechanical equipment applications for facilities critical infrastructure support and contingency planning. And also being a premier rental and service department, ABLE Equipment Rental can be an authorized salesperson for many in the top equipment manufacturers in america, including Sullair, JLG, Genie, Gradall, Lull and Multiquip. To learn more about ABLE Equipment Rental, kindly visit www.cn-crane.com.

Crane collapse crane accident

02/20/2014 17:06

 City officials have suspended all crane operations being a quality crane has collapsed in Upper East Side disaster. This crane collapse killed two construction workers. The crane collapse injured still another man each time a crane crashed into a building ahead of the crane collpased for the street.

The crane collapsed because the crane��s turntable broke loose. Will probably be analyzed for mechanical failure to describe why the crane collapse happened.
The crane collapse made Acting Commissioner Robert LiMandri suspend all city tower crane operations until Monday, June 2. Mayor Michael Bloomberg stated that the crane collapse was unacceptable and intolerable.

The crane collapsed on Friday morning. The crane collapse was at an East 91st Street site. The crane collapse happened following the Buildings Department investigated your website many times. On March 15, a crane collapse on East 51st Street had killed seven people. This crane collapse encouraged officials to enhance crane inspections. The Buildings Commissioner Patricia Lancaster resigned as the crane collapse case was serious.

The crane collapse with metal and scraping. The crane collapse was so loud. Leonard Lorusso, 38, said he and the girlfriend were asleep in the event the crane collapse hit their building. The crane collapse sounded like tanks driving throughout the living-room.��

The crane collapse tore through balconies, busted windows and knocked loose bricks. The crane collapsed to the ground. The crane collapse became a heap of twisted metal.

When the crane collapsed, no one therein building was hurt. The crane operator, Donald Leo, 30, was dead following crane collapsed.

The crane collapse happened soon after 8 a.m.The crane collapse was in a site where construction workers have erected 13 floors of your 32-story residential building.

The crane collapse came all of a sudden. The crane collapse caused a roar that some witnesses thought was obviously a terrorist bomb. Others thought the crane collapse would have been a low-flying jet.

The crane collapse caused the tower crane to snap looking at the turntable. The crane collapse caused its cab, boom and machine deck to fall south and crash into a condominium across at 354 East 91st St.

Investigators don��t understand what caused the crane to break down. LiMandri said a weld that failed could have increase the risk for crane collapse.

The crane collapse killed Ramadan Kurtaj, 27. The crane collapse pinned him beneath part of the crane that hit East 91st Street. The crane collapse hit with such force who’s became embedded several feet in to the street.

1 / 3 worker, Simeon Alexis, plus a pedestrian were treated at Metropolitan Hospital Center for injuries and discharged.

The crane collapse snarled morning traffic. The quality crane collapse forced seven buildings to be evacuated. One building was struck by the crane.

How a Tower Crane goes up

02/20/2014 16:53

 Have you ever been puzzled over how tower crane that you just often see keep going up? Or you just can��t find the ideal explanation in your child��s question when she bugs you on an answer as you stroll past a construction site along with her?

Fret any longer. Here��s a youtube video (below) with amazing 3D Computer Aided Design graphics that you can show for your child to learn a little more about how this tower Crane is amazingly designed and utilized to build the flats or apartments that any of us are in. It in all probability could answer your childhood question that you simply haven��t had time to after so long!

And, if you are a ConsultAtutor 1-to-1 personal home tutor teaching Primary Science or Upper Secondary Physics, you can probably make a approach to make lessons on Forces, Moments etc. more interesting with such ��real-life�� visual learning in 3D. Bridging a web link between theory and practical applications in real life scenarios does give students/tutees greater impetus to research the topics these are learning going to school along with tutorials.

Scissor Lift Table installation to use

02/20/2014 16:51

 From our factory to buy the lift platform, there will always be in the process of installing this or that problem. The lifts will be used in Shi Ding, multifunctional lifts and scaffolding system joint work program or Scissor Lift Table construction elevator hydraulic top the Shengping bridge joint working construction program. Today��s construction unit more popular or recognized both sophisticated and economical method, the application of the power construction unit up. The fourth configuration program is the most advanced one in the construction of the cooling tower equipment combinations.

Pingqiao and lift the foundation must be pouring special attention to the of Pingqiao foundation lifts centerline must coincide, if too much difference between the two centerlines it certainly appears to turn door with Pingqiao go h lifts running to the surface after involved but can not open the fence. Determining the location of the two based in Pingqiao front axle in the most significant to the water tower construction flat layer, after pouring water column of the center of the bridge and water tower does Scissor Lift Table occur without interference, Pingqiao and lifts the basis of the position can team appropriate offset to the direction of the center of the towers, so the location of the water tower throat rose Pingqiao not bound to the front axle complete demolition the Aguilar avoid the bridge overweight condition appears. Pingqiao installation sequence for Section 4 standard sets of planes, slewing platform, rotary tower, tower crane jib tower crane counterweight, rear axle, balance weight moving the front axle and front axle rod, fixed counterweight. Section 4 standard installation, all in high-strength bolts screwed tight to the specified preload the direction of the front and rear axles and perpendicular to the direction of the front and rear axles vertical deviation were measured with a theodolite, must ensure that the installation is complete Section 4 standard to 21mm adjustment of the lift direction deviation, for example, can press the first method will be worn 3.5mm away from the lift of the two legs can also be the second method in the lift side of the two support legs, plus pad 3 .5 mm spacer. If you do not adjust, because the vertical deviation of the tower is not based on the development of a linear relationship, then be flat bridge high will cause vertical deviation is too large and can not be adjusted. The same when installing chassis construction elevator and three standard Scissor Lift Table must also adjust its vertical deviation, gaskets must be added to the bottom of the chassis tube positive.

Thinking of a Job as a Crane Operator

02/20/2014 16:46

 If you’d like being crane operator, you should know more about all the pluses and minuses on the job, in addition to requirements and contradictions. Normally, the job of any crane operator is usually to lift, lower, and move a range of heavy materials. It might appear an easy task at first sight, however in fact it can be very complicated and definitely requires precision and patience. The scope of operating skills is dependent upon the kind of the tower crane, playing with general it is not no more than moving the loads accurately. Some cranes are powered by rails, so the driver has got to regulate the forward and backward movement in the whole crane, while others require which the cabin with the crane can also be maneuvered.

Will it pay?

Based on the U.S. Bureau at work Statistics the normal salary for crane operators in 2008 was $45,430. Indeed.com claims that for May 2010 the normal salary was lower �C $42,000. The income are strongly linked with work experience. For instance within the first 1 to 4 years an operator can earn $16.44 and $30.34 each hour, while with twenty years experience anybody can expect nearly $41,78 (based on PayScale.com). The salary depends also on the region �C the highest earnings are available in Alaska, Nevada, Washington and The big apple.

Requirements

To use a crane safely, a specialized training is indispensable. In most countries another certification is required to be allowed to are employed in the position. To get started your career, you are able to apply for an apprenticeship program. From the U.S. such programs are organized with the International Union of Operating Engineers and extend to 4 years. To get acquainted with it, you should be leastways 18, hold a top school diploma and be in good fitness. Certification is indispensable only in 17 states; nevertheless many employers expect it even when it isn’t mandatory by law. Typically the most popular will be the certificates of National Commission with the Certification of quality crane Operators. NCCCO currently certifies operators of mobile cranes, overhead cranes and tower cranes.

Prospective crane operators must have a rudimentary knowledge of math and physics in addition to some mechanical aptitude. Additionally, operators really should not be afraid of heights, as the crane cabin is usually situated high above the ground. Another necessary quality will be the capacity to judge distance and heights accurately and good hand-eye coordination because they should manipulate various buttons, levers and pedals. As a good crane operator one also needs the potential to figure in a team because it is essential to cooperate with workers outside of the crane who give hand signals, one example is when hooking and unhooking the loads.

Working conditions

Cranes

Crane operators can figure in a number of construction sites, but in addition in other areas where moving of heavy items in necessary: For instance, in companies coping with metal fabrication or transportation equipment. Cranes are indispensable at major ports to load and unload cargo. The running conditions of quality crane operators vary. As an example people operating overhead cranes might be subjected to the heat, smoke and gases generated by factories, while those working outside and operating by handheld control face various varying weather condotions. Fortunately modern cranes have cabins that ensure both comfort and protection.

Truck-mounted crane

02/20/2014 16:30

 A crane placed on a truck carrier affords the mobility just for this form of mobile crane. Generally, these cranes can travel on highways, eliminating the need for special equipment to move the crane. When working on the jobsite, outriggers are extended horizontally in the chassis then vertically to level and stabilize the crane while stationary and hoisting. Many truck cranes have slow-travelling capability (a couple of mph) while suspending a large quanity.

Great care must be taken never to swing force sideways from the direction of travel, as most anti-tipping stability then lies in the stiffness with the chassis suspension. Most cranes in this type likewise have moving counterweights for stabilization beyond that given by the outriggers. Loads suspended directly aft include the most stable, since the majority of on the weight on the quality crane provides a counterweight. Factory-calculated charts (or electronic safeguards) are employed by crane operators to look for the maximum safe loads for stationary (outriggered) work as well as (on-rubber) loads and travelling speeds.

Truck cranes home in lifting capacity from about 14.5 short tons (12.9 long tons; 13.2 t) to about 1,300 short tons (1,161 long tons; 1,179 t).

<< 9 | 10 | 11 | 12 | 13 >>