 From our factory to buy the lift platform, there will always be in the process of installing this or that problem. The lifts will be used in Shi Ding, multifunctional lifts and scaffolding system joint work program or Scissor Lift Table construction elevator hydraulic top the Shengping bridge joint working construction program. Today��s construction unit more popular or recognized both sophisticated and economical method, the application of the power construction unit up. The fourth configuration program is the most advanced one in the construction of the cooling tower equipment combinations.

Pingqiao and lift the foundation must be pouring special attention to the of Pingqiao foundation lifts centerline must coincide, if too much difference between the two centerlines it certainly appears to turn door with Pingqiao go h lifts running to the surface after involved but can not open the fence. Determining the location of the two based in Pingqiao front axle in the most significant to the water tower construction flat layer, after pouring water column of the center of the bridge and water tower does Scissor Lift Table occur without interference, Pingqiao and lifts the basis of the position can team appropriate offset to the direction of the center of the towers, so the location of the water tower throat rose Pingqiao not bound to the front axle complete demolition the Aguilar avoid the bridge overweight condition appears. Pingqiao installation sequence for Section 4 standard sets of planes, slewing platform, rotary tower, tower crane jib tower crane counterweight, rear axle, balance weight moving the front axle and front axle rod, fixed counterweight. Section 4 standard installation, all in high-strength bolts screwed tight to the specified preload the direction of the front and rear axles and perpendicular to the direction of the front and rear axles vertical deviation were measured with a theodolite, must ensure that the installation is complete Section 4 standard to 21mm adjustment of the lift direction deviation, for example, can press the first method will be worn 3.5mm away from the lift of the two legs can also be the second method in the lift side of the two support legs, plus pad 3 .5 mm spacer. If you do not adjust, because the vertical deviation of the tower is not based on the development of a linear relationship, then be flat bridge high will cause vertical deviation is too large and can not be adjusted. The same when installing chassis construction elevator and three standard Scissor Lift Table must also adjust its vertical deviation, gaskets must be added to the bottom of the chassis tube positive.